PERFORMANCE

LNG Terminal







Performance Record

Year Project Name Client Goods of Supply Service Area Site
2023 Korea Energy Terminal Project (LNG PHASE 1) DAEWOO ENC GLB Double Flanged CL.150# 26" LNG Gas Terminal Ulsan, Korea
2022 Korea Energy Terminal VCU Project HANYANG INDUSTRY CO., LTD GTD Lug Type CL.150# 8"~14" LNG Gas Terminal Ulsan, Korea
2022 Pyeongtaek LNG Terminal BOG system rebuilding Project KOGAS Corp. Cryogenic Triple Offset Butterfly CL.150# 10"~20" LNG Gas Terminal Pyeongtaek, Korea
2022 Ulsan Korea Energy Terminal Project (LNG PHASE-1) Korea Energy Terminal Co., Ltd. HP Double Flanged, CL.150#, 40, MOV LNG Gas Terminal Ulsan, Korea
2022 Ulsan Korea Energy Terminal Project (LNG PHASE-2) Korea Energy Terminal Co., Ltd. HP Double Flanged, CL.150#, 40, MOV LNG Gas Terminal Ulsan, Korea
2022 Tongyeong ECO Power LNG Project Hanwha engineering construction POV Cryogenic Triple Offset Butterfly CL.150# 12"~32" LNG Gas Terminal Tongyeong, Korea
2020 Boryeong LNG Terminal Boryeong LNG Terminal Co., Ltd. Cryogenic Triple Offset Buttweld Butterfly CL.300# 8"~20" LNG Gas Terminal Boryeong, Korea
2019 GS E&C Boryeong LNG Terminal Boryeong LNG Terminal Co., Ltd. Cryogenic Triple Offset Butterfly CL.150# 6"~14" LNG Gas Terminal Boryeong, Korea
2018 POSCO Gwangyang NO.5 LNG Tank POSCO ICT Cryogenic Triple Offset Butterfly CL.150# 8"~36", HP 12"~30" LNG Gas Terminal Gwangyang, Korea
2018 Boryeong LNG Terminal Boryeong LNG Terminal Co., Ltd. Cryogenic Triple Offset Butterfly CL.150# 8"~48" LNG Gas Terminal Boryeong, Korea
2018 Vaporizer Send out Facility of Incheon LNG Terminal KOGAS Corp. Cryogenic Triple Offset Butterfly CL.150# 8"~30", HP Lug 12"~30" LNG Gas Terminal Incheon, Korea
2018 POSCO Energy Incheon LNG Plant POSCO Energy GLB CL.150# 24" LNG Gas Terminal Boryeong, Korea
2018 Pyeongtaek Terminal Detachment and Factory Optimization Implementation KOGAS Corp. Cryogenic Triple Offset Butterfly CL.300# 8"~16" LNG Gas Terminal Pyeongtaek, Korea
2017 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Manual Butterfly, CL.150#, 10", 12",24",30' ,32" LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Butterfly, CL.150#, 10", 12", MOV, POV LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Butterfly, CL.300#, 12", 20",24",30" Control LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. General Butterfly, CL150 2"~8" MOV LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. General Manual Butterfly (PIV) CL.150, 36" LNG Gas Terminal Incheon, Korea
2017 POSCO Gwangyang 5 Tank POSCO ICT Cryogenic Triple Offset Buttweld(Flanged) Butterfly, CL.150#~300# 6"~36",MOV, POV, Control LNG Gas Terminal Gwangyang, Korea
2017 POSCO Gwangyang 5 Tank POSCO ICT Cryogenic Triple Offset Buttweld Manual Butterfly, CL.150# LNG Gas Terminal Gwangyang, Korea
2017 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Butterfly, CL.150#, 10"~32" MOV, POV LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Manual Butterfly, CL.150# 8"~30" LNG Gas Terminal Incheon, Korea
2017 Incheon LNG Project KOGAS Corp. General Manual Butterfly (PIV) CL.150, 36" LNG Gas Terminal Incheon, Korea
2017 Jeju LNG Terminal Project KOGAS Corp. Cryogenic Triple Offset Butterfly, CL.150#~300# 10"~12",MOV, POV, Control LNG Gas Terminal Jeju, Korea
2017 GS E&C Boryeong LNG Terminal Project Boryeong LNG Terminal Co., Ltd. Cryogenic Triple Offset Buttweld Butterfly CL.150# 10" LNG Gas Terminal Boryeong, Korea
2015 Incheon LNG Project KOGAS Corp. Cryogenic Triple Offset Buttweld Butterfly, CL.150#, 10", 12", MOV, POV LNG Gas Terminal Incheon, Korea
2014 Pyeongtaek LNG Receiving Terminal I Project KOGAS Corp. Triple Offset Double Flange, Manual & Pneumatic On-Off, CL.150#, 12" LNG Gas Terminal Pyeongtaek, Korea
2014 Samcheok LNG Terminal PHASE 2 Project KOGAS Corp. Triple Offset Buttweld Butterfly Valve, MOV, Pneumatic On-Off Control, CL. 150#, 12" 30" LNG Gas Terminal Samcheok, Korea
2014 Boryeong LNG Terminal Project Phase-I Boryeong LNG Terminal Co., Ltd. Triple Offset Buttweld Butterfly Valve, CL. 150#, 8"~ 48" LNG Gas Terminal Boryeong, Korea
2013 Samcheok LNG Terminal 1-2 Project KOGAS Corp. Triple Offset Metal Graphite Seated Pneumatic Control, ASME 300#(Cryogenic) 10"~16" LNG Gas Terminal Samcheok, Korea
2013 Pyeongtaek LNG Project KOGAS Corp. Triple Offset Butterfly Valve, Pneumatic On-Off Control, Manual, CL.150#, 8"~24" LNG Gas Terminal Pyeongtaek, Korea
2013 LNG Plant R&D Project GS E&C CORP. Triple Offset Butterfly Valve, Pneumatic Control, ASME CL.300# 16" LNG Gas Terminal Incheon, Korea
2004 Incheon LNG Terminal POSCO E&C HP Butterfly Valve, Manual 4"~30", CL.150 LNG Gas Terminal Incheon, Korea
2000 Tongyeong LNG KOGAS Corp. Double Flange, Rubber Lined2" ~ 40", CL.150, Stem Extended LNG Gas Terminal Tongyeong, Korea
1999 Incheon LNG Project KOGAS Corp. Butterfly Valve, Rubber Lined Fire-Safe,2"~60", CL.150 LNG Gas Terminal Incheon, Korea
1999 Incheon LNG Receipt Terminal KOGAS Corp. HP & Rubber Lined, 3" ~ 36, Manual, Electric, Double Flange LNG Gas Terminal Incheon, Korea
1994 Pyeongtaek LNG Terminal KOGAS Corp. HP Butterfly Valve, Electric 3" ~ 20" LNG Gas Terminal Pyeongtaek, Korea